<< IMPORTANT NOTICE >>
Development of and support for the ERACS software product will come to an end on 21 December 2023. Please do not hesitate to contact us if you require further assistance.
Details of new features & fixes across the ERACS versions.
A new program option called 'G5/4' has been added to the ERACS suite. Engineering Recommendation (ER) G5/4 sets the planning levels for harmonic voltage distortion to be used in the process for the connection of non-linear equipment to the public electricity system within the United Kingdom. The G5/4 calculation implemented in ERACS will calculate voltage distortion and harmonic currents flowing at the point of common coupling (PCC) as a result of the connection of non-linear loads. These voltage distortion and harmonic currents are subsequently compared against the planning levels specified in ER G5/4 and are presented in a tabular format.
This site or the third party tools it uses, make use of cookies needed to function and useful for the purposes indicated in the cookie policy. To learn more or deny consent, consult the cookie policy. By closing this banner, scrolling this page, clicking on a link or continuing to browse in another way, you accept the use of cookies.